brb: >Welcome to consult! Wuxing Well Point Dewatering, Wuxing Deep Well Dewatering, and Wuxing Road Foundation Pit Light Dewatering Company drill deep water wells, the depth is generally around meters
< brb: r >Right, and the flow rate can reach tons per hour. The deep well water is crystal clear, without silt and turbidity, and has a constant temperature
< brb: r >℃ all year round. It is mainly used for corporate factories, br >machinery
cooling and heatingbr >air conditioning
, bleaching, dyeing and washing. Injection moldingbr >Chemical industry
Green
< brb: r >Chemical, aquaculture, bathrooms, construction sites, water plants, villas, units, families, etc. all use water.
< brb: r >Deep water wells are opened to the groundwater layer, which is warm in winter and cool in summer. It is inexhaustible and cannot be exhausted if it is continuously pumped. The team started
< brb: r >drilling deep wells to ensure flow and ensure the quality of water pumps, pipelines and other materials. They are on call and implement three guarantees
< brb: r >Track services to ensure credibility , Quality strives for survival.
< brb: r >Deep well specifications are generally divided into the following categories:
< brb: r >: The flow rate is generally required to be within tons per hour, the depth is about meters, and the drilling rig opening has an approximate diameter of
/> < brb: r > Centimeter, the diameter of the lowered well wall pipe is ,, the water pump power is .. submersible depth
< brb: r >Water pump, the well wall pipe specifications are C customized high quality br >Pipe material
, with high-quality stamps
< brb: r >samples, inspection reports, etc. The pipe has strong hardness and can withstand strong lateral pressure. The water pipe comes with a water-permeable bag
< brb: r > Pass through the filter screen
to ensure that the deep water well is fresh and free of sediment, impurities, etc. The outlet pipe is a nylon pipe with a diameter of . It depends on the rise of underground water level
< brb: r >. All areas around the wall pipe should be sealed with coarser yellow sand, and the top of the wellhead can be sealed flat to restore the ground to its original appearance. This
< brb: r >Drilling of deep wells of this specification requires the construction unit to provide br >power supply
(three-phase), water source, and yellow sand (the coarsest specification has no
< brb: r > Mud) and mud drainage channels, the drilling time is generally about a day to be basically completed.
< brb: r >B: The flow rate is about tons, the depth is generally about meters, the diameter of the pores drilled by the drilling rig
< brb: r >is about, the diameter of the lowering well wall pipe is, the diameter of the water pump Power. Submersible multi-stage deep well
< brb: r >Pump, well wall pipe specifications are steel-concrete prefabricated high-quality pipes, and the water intake pipe is attached with a bag
< brb: r >There is a permeable filter and a water outlet pipe. Anti-corrosion iron pipe with a diameter of 1.5 inches. The deep well pump is placed about a meter
< brb: r > in the deep well, depending on the degree of rise in the underground water level. Fill in all the specifications around the water intake pipe
< brb: r >. >Quartz
Sand, the quartz sand is all sealed with mud, and the top of the wellhead can be sealed flat to restore the ground to its original appearance
< brb: r >. During the drilling of a deep well of this specification, the construction unit must provide power (three phases can be used continuously
< brb: r >), water source and mud drainage channels. The drilling time is generally about days.
< brb: r >C: The requirements for drilling fresh water wells with guaranteed water quality are generally more stringent. The water composition indicators basically meet drinking water standards. The flow rate is tons per hour. The drilling depth in Jiangsu and Zhejiang generally needs to be below meters
< brb: r >(Shanghai needs to be below meters), and the specifications for lowering the well wall pipe are steel-concrete
< brb: r >Prefabricated high-quality The pipe material is an anti-corrosion iron pipe with a diameter of 1.3 inches for the outlet pipe. The deep well pump is placed about
< brb: r > meters in the deep well, depending on the degree of rise in the underground water level. Fill all the surrounding areas of the permeable pipe with quartz sand of specification
< brb: r >. The upper layer of quartz sand must be sealed with yellow mud with strong viscosity and no impurities.
< brb: r>The entire wellhead can be sealed flat to restore the ground to its original appearance. During the drilling of a deep well of this specification, the construction unit must provide power (three phases can be used continuously), water source, and yellow mud (transported to the side of the well).
< brb: r >The drilling time is generally about days.
< brb: r >: Drilling deep wells underground in rocks. The drilling difficulty of the deep wells is relatively high and the construction period is long. Drilling is customized according to different geological
< brb: r > rock formation structures.
< brb: r >The above data on deep well drilling are for reference only, and the details shall be completed through mutual consultation between Party A and Party B.
< brb: r >Business scope: Consultations are welcome across the country!
Wuxing well point dewatering, deep well dewatering, Wuxing dewatering well, light well point dewatering, Wuxing road foundation pit dewatering